Hi Kiss 6ft 30ft 50ft 100ft 160ft 200feet Black Extra Long Line Training Dog Leash – For Large,Medium and Small Dogs – Long Lead – Great for Training, Play, Camping, or Backyard

£6.99£9.99

NYLON TRAINING LEAD – This durable, long, nylon dog training leash will outlast cotton leashes. All stitching is reinforced and the nickel plated clip swivels to resist twisting. Our long dog leash is great for small and medium and large dogs. You’ll love using it as a backyard dog leash, for off leash dog training, and more.
DIMENSIONS – This dog leash measures by 6 feet long. Great for hiking, camping, training, hunting, backyard, beach, recall training, outdoor play with tennis balls, and swimming!
LONG LEASH: This training leash is great for teaching your dog recalls. It has the length needed to allow them to wander and ensure your command to come! is obeyed.Allows you to teach your dog recalls and other obedience skills.

Clear
SKU: N/A Category:
Show Buttons
Hide Buttons